Transgrid to build 500 kV grid link to unlock renewables in NSW

Transgrid plans a 500 kV transmission link in New South Wales, aimed at opening the way for more renewable generation to connect to the state's grid.

High-voltage steel transmission towers crossing farmland in New South Wales under a clear sky
Image: AI-generated illustration

Transgrid is to build a 500 kV grid link in New South Wales (NSW) intended to unlock renewable energy in the state, according to Renewablesnow.

The high-voltage connection is described as a means of enabling more renewable generation to reach the NSW network. Transmission capacity is widely seen as a constraint on bringing new wind, solar and storage projects online, and a 500 kV link would sit at the top end of the voltage range used on the state's grid.

© 2026 EnergyInsider. All rights reserved. EnergyInsider is a trading name of Blueberry Drive Ltd, a company registered in England and Wales (company number 14338902). Registered office: 167-169 Great Portland Street, 5th Floor, London W1W 5PF. The information published on EnergyInsider is for general informational purposes only and does not constitute investment advice, financial advice, trading advice, or any other form of professional advice. Nothing on this site should be construed as a solicitation or offer to buy or sell any security or financial instrument. Past performance is not indicative of future results. Readers should conduct their own due diligence and consult a qualified financial adviser before making any investment decision. EnergyInsider accepts no liability for any loss or damage arising from reliance on information published on this site.